Infraestructures de la...
Barcelona. Toyser was commissioned to use a precision measuring trolley to scan a total of four railway tunnels on the lines operated by Adif and Ferrocaril Metropolità de Barcelona (FMB) with an overall length of 800 metres.
The scanning of these four tunnels was part of the precision measuring of the structures affected by the new road tunnel between the streets Castillejos and Badajoz foreseen in the project for road tunnels in Las Glòries Square
Toyser provided the technical equipment required for these measurements: an Amberg GRP 5000 railway track trolley with an HDS 6200 scanner and a Leica TS30 total station with 0.5" angular accuracy and 0.6 mm in distance. The work speed was 0.9 km/hour in order to record a point density of 5 x 5 mm.
This project was supplemented by a photo report on all the tunnels, with a total of more than 2,500 pictures.
Customer
- Barcelona d'Infraestructures Municipals
Category
- Services
- Laser scanning
- Aplication Field
- Civil engineering
Date
- 25/07/2015
Related links
Related projects
-
Tacheometric survey for the design of the new...
-
Tacheometric survey of the viaduct over the AP7...
Infraestructures de la...
-
Laser scanning and topography for a water distribution...
AYESA
-
Scanning and creation of a 3D model of the structure...
B:SM - Barcelona de Serveis...
-
Scanning 11 tunnels on the Zaragoza Barcelona...
AMBERG INFRAESTRUCTURAS,...
-
Precision scanning of four tunnels in Las Glòries...
Barcelona d'Infraestructures...
-
Scanning and creation of a 3D model of the base...
Abadia de Montserrat
-
Scanning of the Regajal tunnel on the AVE high-speed...
AMBERG INFRAESTRUCTURAS,...
-
Scanning plane of the Tibidabo amusement park
EIPM
-
Laser-scanning topographic survey of the tunnel...
Fast Consortium UTE