Fomento de Construcciones...
Fast Consortium, a temporary joint venture commissioned to build Line 5 of the Saudi capital's metro, contracted Toyser to carry out the necessary work for the geometrical definition of the 12-kilometre tunnel on Line 5 of the Riyadh metro in Saudi Arabia.
In view of the difficulty involved in the data gathering process for this huge public project, Toyser proposed the use of laser-scanning technology, which would allow plotting a 3D model of points with exceptional quality in a very short time.
The scanning was scheduled to take place over a period of eighteen days. In the end, however, and given the customer's urgency, the layout of the metro line and the placement of the stations were completed in only twelve days, including working a twelve-hour day at the weekends.
Considering that the technical equipment used is highly sensitive, and to ensure the customer's requirements were met in terms of deadlines, Toyser ruled out several options, such as the temporary importing of the laser scanner through a specialised transport firm. The deployment of the equipment in perfect conditions was ensured by booking it a seat on a flight as just another passenger; with its own ticket, of course.
Customer
- Fast Consortium UTE
Category
- Services
- Laser scanning
- Aplication Field
- Civil engineering
Date
- 03/10/2016
Related links
Related projects
-
Bathymetry for the wharf at Hotel Vela
-
Movement monitoring of the buildings adjacent...
Infraestructures de la...
-
Topography for the Pinyana canal in Alpicat (Segrià)
EUROGEOTÉCNICA
-
Topography for the extension of the Catalan railway...
FERROCARRILS DE LA GENERALITAT...
-
Tacheometric survey of the viaduct over the AP7...
Infraestructures de la...
-
Tacheometric survey for Barcelona Metropolitan...
TMB, Transports Metropolitans...
-
Widening of the C-66 road
Infraestructures de la...
-
Topography for the refurbishment project involving...
Àrea Metropolitana de...
-
Bathymetry for the decontamination of the Flix...
UTE EBRE FLIX
-
Tacheometric survey for the Special Economic Zone...
CICSA, CONSULTOR DE INGENIERIA...
-
Laser scanning and topography for a water distribution...
AYESA
-
Tacheometric survey for the Master Plan for Montjuïc...
Barcelona d'Infraestructures...
-
Tacheometric survey of the Tennis Montjuïc Council...
Barcelona d'Infraestructures...
-
Topography for the redesign of the accesses to...
Infraestructures de la...
-
Tacheometric survey for the Artés bypass
Infraestructures de la...
-
Scanning 11 tunnels on the Zaragoza Barcelona...
AMBERG INFRAESTRUCTURAS,...
-
Precision scanning of four tunnels in Las Glòries...
Barcelona d'Infraestructures...
-
Scanning and creation of a 3D model of the base...
Abadia de Montserrat
-
Tacheometric survey from the weighing station...
Infraestructures de la...
-
Tacheometric survey for improving accessibility...
Infraestructures de la...
-
Scanning of the Regajal tunnel on the AVE high-speed...
AMBERG INFRAESTRUCTURAS,...
-
Topography for locating the wastewater network...
Municipal Institute of...
-
Precision scanning of Sant Antoni station on Line...
Municipal Institute of...
-
Laser-scanning topographic survey of the tunnel...
Fast Consortium UTE